Proposed preventive rule P2

Safety case, independent testing and binding stop conditions

Before release, an independent evaluator tests a frontier model for dangerous capabilities; the law fixes in advance when work must stop; testing continues after release.

Contents

Who this applies to

  • Frontier developer: Files a safety case before its licence and each large change, gives the evaluator access, monitors the model after release, and stops training and release when a stop condition is met.
  • Modifier: When treated as a frontier developer, files its own safety case for the changed model.
  • Accredited evaluator: Tests independently of the developer, keeps what it learns confidential, and reports its results to the authority.

Anyone not listed has no duty under this rule. End users, people using AI for private purposes, have none. All roles

Why a country needs this

Without a law, developers decide for themselves how to test their models, who checks the results and when to stop. Voluntary commitments bind only those who sign them, and each company writes its own conditions for pausing. A capable model may also behave differently when it detects that it is being tested.

The rule in plain words

  • Before a licence (P1) and before each large change, the developer files a safety case: which dangerous capabilities were tested, the results, the safeguards.
  • An accredited independent evaluator with the access it needs does the testing, or checks the developer's, under a duty of confidentiality.
  • The law fixes stop conditions in advance: self-copying, evasion of oversight, material uplift towards mass-casualty weapons, or autonomous cyberattack, where the safeguards accepted in the safety case are missing or shown in testing not to work. When the developer's own tests or the evaluator's report find one, the developer stops training and release at once and tells the regulator within 24 hours; the regulator can also find one itself. Work needed to investigate or fix the problem continues in containment.
  • Within seven days of the developer's notice, of an evaluator's report finding a stop condition, or of its own finding, the regulator confirms or lifts the stop by a reasoned decision. If it does not decide in time, the stop counts as confirmed, so the developer always has a decision it can take to court. A confirmed stop lasts until the regulator lifts it; it decides on a request to lift it within 30 days.
  • The safety case does not end at release. The developer monitors how the released model behaves and is used, and updates the safety case when it finds a dangerous capability.
  • The regulator may test the released version without notice. If the evaluator or the regulator finds that a model's results change materially when it can tell it is being tested, the regulator may treat that as a stop condition until the tests can be relied on again.
  • The evaluator sends its report to the regulator directly, not only through the developer.

Model wording

Proposed wording, not law. Words in [square brackets] are choices for your legislature. Terms such as “frontier model” are defined in the shared definitions.

Section P2.1. Safety case

Before a frontier model is licensed under Section P1.2, and before each substantial modification [, meaning a change that uses more than (a set share) of the computation used to train the model or that testing shows adds a dangerous capability], the frontier developer shall submit to the competent authority a safety case setting out: (a) the dangerous capabilities assessed and the methods used; (b) the results; (c) the safeguards applied and the evidence that they are effective; (d) the remaining risks and the reasons why they are acceptable.

Section P2.2. Independent testing

(1) The assessment under Section P2.1 shall be carried out or verified by an accredited evaluator. (2) The frontier developer shall give the evaluator access to the model and its documentation [and, where needed for a specific part of the assessment and compatible with the international agreements binding (the State), its source code] to the extent needed for the assessment. The evaluator shall keep confidential the information it obtains. (3) The competent authority shall accept or reject the safety case within [90] days. For a substantial modification of a licensed model, Section P1.2(5) applies instead. (4) The accredited evaluator shall send its report directly to the competent authority at the same time as to the frontier developer.

Section P2.3. Monitoring after release

(1) The frontier developer shall monitor the behaviour and use of the model after it is made available, assess whether dangerous capabilities appear that the safety case did not identify, and update the safety case within [30] days of identifying one. (2) The competent authority may test any version of the model that is made available, without notice.

Section P2.4. Stop conditions

(1) A stop condition is met where the frontier developer's assessment under Section P2.1 or P2.3, a report of the accredited evaluator under Section P2.2(4), or a reasoned decision of the competent authority finds that a model can: (a) copy itself beyond its authorised environment; (b) evade, disable or resist oversight or shutdown; (c) provide material uplift towards chemical, biological, radiological or nuclear harm on a mass scale, as in paragraph (a) of the definition of dangerous capability; or (d) carry out cyberattacks on essential entities without human direction, and the safeguards in its accepted or filed safety case, or required by the conditions of its licence or registration, are absent or have been shown in testing not to be effective against it. (2) From the time it knows that a stop condition is met, the frontier developer shall stop further training and making available of the model, limit its use to work needed to investigate or remedy the condition in a contained environment under Section P9.3, and notify the competent authority within [24 hours]. (3) Within [seven] days of the notification, of receiving a report under Section P2.2(4) that finds a stop condition, or of its own finding, the competent authority shall confirm or lift the stop by a reasoned decision. If it does not decide within that period, the stop is deemed confirmed. The decision or deemed confirmation may be challenged under Section G.6. (4) Where the accredited evaluator or the competent authority finds that test results differ materially depending on whether the model can detect that it is being tested, to an extent that undermines the assessment, the competent authority may by reasoned decision treat this as a stop condition until the safety case shows that the assessment can be relied on. (5) A stop confirmed under paragraph (3) or decided under paragraph (4) ends when the competent authority lifts it in writing. It shall decide on a request to lift it within [30] days, and its decision may be challenged under Section G.6.

In practice

Who runs it
The competent authority accepts or rejects safety cases and lifts stops. Evaluators are accredited by it or by the national accreditation body.
What it takes
Staff able to read a safety case, and a pool of accredited evaluators. The developer pays for the testing. Few countries have this capacity today; the others rely on results accepted elsewhere (P11).
How it is enforced
No licence without an accepted safety case. Suspension of the licence when a stop condition is met (P1). Fines, and criminal liability for knowingly ignoring a stop or falsifying a safety case (P13).
In a country with no frontier developer
Rely on safety cases and test results accepted under a recognised regime, or produced by an accredited evaluator or a body named under P11.1(3), as P1.3(3) allows (G.3), and file them with the registration. Developers abroad file changes rather than wait for approval (G.1(3)(d)). Keep the power to ask for documents, and act on a stop condition reported anywhere by suspending the registration.
What it cannot do
Tests can miss capabilities, and a model may hide them. The rule makes testing independent and continuous; it cannot make it complete. It binds developers abroad only through access to the market.

Where this already works

Safety cases for nuclear plants and for offshore oil and gas installations, where the operator must show the regulator why the remaining risks are acceptable. Independent certification in aviation. California's SB 53 (2025) and New York's RAISE Act require frontier developers with annual revenue above $500 million to publish their safety frameworks, without independent testing or fixed stop conditions. When New York amended its act in 2026, it dropped an annual independent audit and a ban on deploying a model that would create an unreasonable risk of critical harm.

Drafting notes

  • Tests should be built so that a model cannot easily tell them from real use; the law can require that, but the method belongs in technical rules the authority keeps current.
  • "Substantial modification" needs a definition, for example a change in training compute above a set share or a new capability found in testing; the definition of a modifier uses the same tests.
  • Most models show some awareness of being tested, and intent cannot be proven. P2.4(4) therefore turns on a finding that results change materially, to a degree that undermines the assessment, and leaves the decision to the authority.
  • A stop takes effect when the developer knows of a finding, because waiting for a decision could mean days of training a model that copies itself. The decision within seven days under P2.4(3) gives the developer an act it can challenge, and the offence in P13.4 applies only to work continued after the developer knew of the finding or after the stop was confirmed.
  • Access to source code is limited to what a specific part of the assessment needs, because some trade agreements restrict requiring source code as a condition of market access.
  • For a developer abroad, a stop under P2.4 applies to its work and its market in the country, and ends when this authority or the authority of a recognised regime lifts it (G.1(3)).
  • A country without its own evaluators can accredit foreign ones, or rely on results accepted under a recognised regime (P11, G.3).

In an EU Member State? How this rule relates to EU law.

Cite as: regulations.ai, Proposals for legislators, version 0.9 (19 November 2026), P2.